New Building: Helsinki Shipyard NB516, NB517 and NB518
We were responsible for:
Engine room pipes from seawater pipes to Hi-Fog lines
- Seawater pipes
- Gray and ballast tubes
- Working air, pilot air and takeoff air
- Lubricating oil and DO lines
- Freshwater lines (copper)
- Swimming pool lines (CuNiFer)
- Hi-Fog lines
- Urea lines (AISI 316)
Engine room ventilation
- Thick plate ducts and spiros, including installation of fans and fire dampers
Command bridge tubes and ventilation
Steel work
- Raster anchor pockets, body change notifications
- Cable trast for the entire ship and installations on electrical cabinet bases
- Machine equipment installations
- Installation of WT doors, weatherproof doors and fire doors in technical rooms
Ongoing work
- Piping for deck equipment, ventilation and cable rails and block equipment for machine areas
- EMS + JMS block equipment in the machined and deck areas
- We’re the regional director of technical departments