New Building: Helsinki Shipyard NB516, NB517 and NB518

We were responsible for:


Engine room pipes from seawater pipes to Hi-Fog lines

  • Seawater pipes
  • Gray and ballast tubes
  • Working air, pilot air and takeoff air
  • Lubricating oil and DO lines
  • Freshwater lines (copper)
  • Swimming pool lines (CuNiFer)
  • Hi-Fog lines
  • Urea lines (AISI 316)

Engine room ventilation

  • Thick plate ducts and spiros, including installation of fans and fire dampers

Command bridge tubes and ventilation

Steel work

  • Raster anchor pockets, body change notifications
  • Cable trast for the entire ship and installations on electrical cabinet bases
  • Machine equipment installations
  • Installation of WT doors, weatherproof doors and fire doors in technical rooms

Ongoing work

  • Piping for deck equipment, ventilation and cable rails and block equipment for machine areas
  • EMS + JMS block equipment in the machined and deck areas
  • We’re the regional director of technical departments